pre wrapper border up
Success Stories |

Brass LNG IT Infrastructure Project for Headquarters

Sunday, May 15th, 2011 at 1:19 pm

it-infrastructure-brass-lng-wsi

 

Project Details

The Brass LNG project was awarded in 2008 by ACCL.

This included: APC Infrastructure X solution, Cisco Data Centre, Unified Collaboration, IP CCTV, logical and Physical Access Control, installation and integration of Petra Chillers.

We built the data centre with APC cooling, UPS Systems and racks, this solution had In row units with fans and condensers with a CDU (Central Distribution Unit) for Cold and hot water distribution within the systems, we integrated the APC cooling units with a Petra Chiller for Cold water supply through a controlled valve system. The cold supply is distributed and the warm water is returned back to the Chiller and all this happens within a controlled environment.

The data centre was built on Cisco infrastructure for the routing and switching, IP Telephony with enterprise call managers and voice messaging system, the logical and physical access systems were integrated back into the data centre for Single-Sign-on capabilities.

 

Request Contact

Request a contact for more information about this job or start your buying process for your own project.

post wrapper border down

initiate contact
get support
follow us via social media
Solutions
Infrastructure Solutions
Software & Enterprise Applications
Services
About Weco Systems
Request For Support
Careers@Weco
Resources
News@Weco